Debugging steps of tile press equipment
1. When adjusting the tile press equipment, cut off the power supply and move the workpiece, you should pay attention to the safety of your hands.
2. All parts of the machine tool should be lubricated frequently, and the operator should be lubricated once per shift, and the mechanic should fill the rotating bearing part with lubricating oil once every six months. The upper blade of the shearing machine is fixed on the knife holder, and the lower blade is fixed on the workbench. The table is equipped with a supporting ball so that the sheet does not get scratched when sliding on it. Pressing cylinders are used to press the sheet to prevent the sheet from moving when sheared. Guardrails are safely assembled to prevent work-related injuries from occurring.
Shearing machine monopoly procedures:
3. Before operation, wear tight-fitting protective clothing, the cuffs should be fastened, the hem of the jacket should not be open, and it should not be worn, undressed, or clothed next to the machine tool to prevent the equipment from being strangled. Wear a safety hat, braids should be put into the hat, and skirts and slippers should not be worn. After shearing, the shearing machine should be able to be sheared by the straightness and parallelism of the shear surface of the sheet, and try to reduce the twisting of the plate, so as to obtain the workpiece backgauge for sheet positioning, the position is adjusted by the motor The return stroke generally relies on nitrogen, and the impact is small.
4. This machine tool is suitable for all kinds of steel plates, copper plates, aluminum plates and non-metallic material plates with the thickness of shearing materials rated by the machine tool, and it is a material without hard marks, welding slag, slag inclusion and welds, and it is not allowed to exceed the thickness.
5. The name of the use of this machine tool: a. Adjust the gap of the blade according to the thickness of the material to be sheared.
6. The operating staff of this machine tool is familiar with the structure, performance and use of the shearing machine b. Adjust the mold or fixture according to the width of the sheared material. c. Before the operation of the machine tool, 1-3 idle strokes should be made, and the shearing work can be implemented only after normal.
7. If the equipment is found to be running abnormally during use, immediately cut off the power supply and shut down for inspection.